Freezer expiry review — due 2026-09-13 #419

Open
opened 2026-08-16 14:25:34 +00:00 by jared · 1 comment
Owner

Origin

User-directed backlog reset on 2026-08-16: all open tickets frozen with the frozen label; this ticket is the scheduled expiry review.

Instructions

On or after 2026-09-13, for each still-open frozen ticket:

  1. Check whether any live-run fix since 2026-08-16 touched the same area
  2. Matches are unfrozen or closed-as-fixed with evidence
  3. All remaining frozen tickets are bulk-closed with the note: "superseded by live-run reset, 2026-08-16"
## Origin User-directed backlog reset on 2026-08-16: all open tickets frozen with the `frozen` label; this ticket is the scheduled expiry review. ## Instructions On or after 2026-09-13, for each still-open `frozen` ticket: 1. Check whether any live-run fix since 2026-08-16 touched the same area 2. Matches are unfrozen or closed-as-fixed with evidence 3. All remaining frozen tickets are bulk-closed with the note: "superseded by live-run reset, 2026-08-16"
Author
Owner

Expiry review 2026-10-18 (partial, read-only). Done: spot checks of the 46 open frozen tickets (#62 to #391); no unfreeze, close, or label change. Evidence (git log --since=2026-08-16): #284 still stale (LIVE_TEST_FILES in plugins/os-sdlc/skills/mine-lints/references/implement-cop.md:22). Possible overlap, unconfirmed: #262 (c30e703a), #193 (a3fc28ae), #116/#226/#349/#387/#391 (lint refactors 7fc5e28b, 0e6a6067, ab429cf5). Follow-ups: Jared decides per-ticket checks, then unfreeze or close-as-fixed matches, then bulk-close the rest with 'superseded by live-run reset, 2026-08-16'. The waiting label stays: the date gate passed, but the bulk close needs a human decision.

Expiry review 2026-10-18 (partial, read-only). Done: spot checks of the 46 open frozen tickets (#62 to #391); no unfreeze, close, or label change. Evidence (git log --since=2026-08-16): #284 still stale (LIVE_TEST_FILES in plugins/os-sdlc/skills/mine-lints/references/implement-cop.md:22). Possible overlap, unconfirmed: #262 (c30e703a), #193 (a3fc28ae), #116/#226/#349/#387/#391 (lint refactors 7fc5e28b, 0e6a6067, ab429cf5). Follow-ups: Jared decides per-ticket checks, then unfreeze or close-as-fixed matches, then bulk-close the rest with 'superseded by live-run reset, 2026-08-16'. The waiting label stays: the date gate passed, but the bulk close needs a human decision.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jared/cc-os#419
No description provided.