Resolve .cc-os/config from owning repo root inside worktrees (os-sdlc) [capture] #415

Open
opened 2026-08-16 12:02:13 +00:00 by jared · 2 comments
Owner

Context

Surfaced running /os-sdlc:implement #412 from a git worktree (.claude/worktrees/issue-412). .cc-os/config is untracked, so worktrees do not carry it, and os-sdlc tracker_from_config only looks at the project root (the worktree). os-backlog already solves this with ConfigLocator resolving from the owning repo root; os-sdlc should do the same or reuse it. Workaround on 2026-08-16 was hand-copying the config file into the worktree.
VERDICT: CREATE — observed real failure with an existing analogous fix (os-backlog ConfigLocator) to point to.

## Context Surfaced running /os-sdlc:implement #412 from a git worktree (.claude/worktrees/issue-412). .cc-os/config is untracked, so worktrees do not carry it, and os-sdlc tracker_from_config only looks at the project root (the worktree). os-backlog already solves this with ConfigLocator resolving from the owning repo root; os-sdlc should do the same or reuse it. Workaround on 2026-08-16 was hand-copying the config file into the worktree. VERDICT: CREATE — observed real failure with an existing analogous fix (os-backlog ConfigLocator) to point to.
Author
Owner

Root ticket filed: #418. This ticket is a symptom.

Root ticket filed: #418. This ticket is a symptom.
Author
Owner

Frozen in the 2026-08-16 backlog reset — see #419 for the expiry procedure. Do not work unless a live run rediscovers this issue.

Frozen in the 2026-08-16 backlog reset — see #419 for the expiry procedure. Do not work unless a live run rediscovers this issue.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jared/cc-os#415
No description provided.