os-sdlc phase 4: production shakedown #334
Labels
No labels
P0
P1
P2
P3
bug
category/code-change
category/cross-repo
category/eval-run
category/investigation
category/no-test-target
category/owner-ruling
category/prose-artifact
category/recurring-chore
category/structure
category/umbrella
crc-refactor
create
delete
enhancement
filed-by/agent
filed-by/user
frozen
lint-rule
needs-info
needs-triage
next
plugin/cc-architect
plugin/os
plugin/os-adr
plugin/os-aidd-lint
plugin/os-backlog
plugin/os-context
plugin/os-doc-hygiene
plugin/os-sdlc
plugin/os-vault
project/cc-os
ready-for-agent
ready-for-human
recurring
review
rule-proposal
update
waiting
wayfinder:grilling
wayfinder:map
wayfinder:map
wayfinder:research
wayfinder:task
wayfinder:task
wontfix
worklist/deviations
worklist/lint-rule
worklist/new-implement-build
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
jared/cc-os#334
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Run a real ticket end-to-end through the registered pipeline; fix what reality breaks. PostToolUseFailure handling gets built here only if a live run shows it's needed (explicitly deferred). Depends on #333.
Frozen in the 2026-08-16 backlog reset — see #419 for the expiry procedure. Do not work unless a live run rediscovers this issue.
Checked 2026-10-12 (sweep refusal: problem absent). Kept open: the --live mode exists, but plugins/os-sdlc/skills/ticket-takedown/SKILL.md step 4 (implementation phase) is still marked NOT YET TESTED, so the end-to-end shakedown the ticket asks for is not shown as done. Run folder: docs/takedown/334-20261010-110743.
Resolution
Done: Production shakedown of the os-sdlc implement phase done via the takedown-implement map; SKILL.md section 4 no longer marked NOT YET TESTED.
Evidence: Section 4 ran live end to end on #984: takedown docs/takedown/984-20261012-094346 (relevance, research, design, per-method final-red), then /os-sdlc:implement 984 takedown-implement = implementation 37: test-writer, programmer, behavior-verifier, suite-check, contract-auditor all pass, 0 retries, 2 min 1 s; Runner commit
dcf66e4dmerged to main; #984 closed. SKILL.md marker removed in94c865f5.Follow-ups: none