os-sdlc: dispatch prompts say 'project-config unresolved' defaults despite valid --target #301

Closed
opened 2026-08-06 21:17:14 +00:00 by jared · 4 comments
Owner

In #297, with .sdlc/project.yaml defining os-aidd-lint code_path/test_path and --target passed, dispatch prompts still contained 'code_path=lib (default -- project-config unresolved)'. Target resolution seems not threaded into prompt building.

In #297, with .sdlc/project.yaml defining os-aidd-lint code_path/test_path and --target passed, dispatch prompts still contained 'code_path=lib (default -- project-config unresolved)'. Target resolution seems not threaded into prompt building.
Author
Owner

Blocked by #303

Blocked by #303
Author
Owner

Still open: blocked by #303 (also open, unresolved). project.rb/lint_worklist_target.rb show no target-in-artifact.yml threading yet.

Still open: blocked by #303 (also open, unresolved). project.rb/lint_worklist_target.rb show no target-in-artifact.yml threading yet.
Author
Owner

Frozen in the 2026-08-16 backlog reset — see #419 for the expiry procedure. Do not work unless a live run rediscovers this issue.

Frozen in the 2026-08-16 backlog reset — see #419 for the expiry procedure. Do not work unless a live run rediscovers this issue.
Author
Owner

Resolution

Done: Sweep 2026-10-10 (ruled 2026-10-12): problem absent or no longer applies. Test asserts refute_match(/code_path=/) on project-config --show output, so the 'code_path=' text is pinned as absent.

Evidence: docs/takedown/301-20261010-110428 : Test asserts refute_match(/code_path=/) on project-config --show output, so the 'code_path=' text is pinned as absent.

Follow-ups: none

## Resolution **Done:** Sweep 2026-10-10 (ruled 2026-10-12): problem absent or no longer applies. Test asserts refute_match(/code_path=/) on project-config --show output, so the 'code_path=' text is pinned as absent. **Evidence:** docs/takedown/301-20261010-110428 : Test asserts refute_match(/code_path=/) on project-config --show output, so the 'code_path=' text is pinned as absent. **Follow-ups:** none
jared closed this issue 2026-10-12 13:40:22 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jared/cc-os#301
No description provided.