POODR map T9: supervised end-to-end drive of the POODR map #467

Closed
opened 2026-08-21 16:21:47 +00:00 by jared · 3 comments
Owner

Map: #458
Blocked by #461
Blocked by #462
Blocked by #466

Drive one narrow real ticket through the full map; record every dispatch, handoff, gate result, edge, and bound spend to docs/os-sdlc-rebuild/poodr-map-first-drive.md; evaluate deferred risks R3 (gate-output truncation) and R4 (guard live proof) triggers.

Spec: docs/os-sdlc-rebuild/poodr-map-spec.md (ticket 9); blueprint sections cited there are authoritative.

Map: #458 Blocked by #461 Blocked by #462 Blocked by #466 Drive one narrow real ticket through the full map; record every dispatch, handoff, gate result, edge, and bound spend to docs/os-sdlc-rebuild/poodr-map-first-drive.md; evaluate deferred risks R3 (gate-output truncation) and R4 (guard live proof) triggers. Spec: docs/os-sdlc-rebuild/poodr-map-spec.md (ticket 9); blueprint sections cited there are authoritative.
Author
Owner

Work started via /loop build session (spec §7 ticket 9). First convening the committee to select the drive ticket.

Work started via /loop build session (spec §7 ticket 9). First convening the committee to select the drive ticket.
Author
Owner

Committee D03 ruled: the drive works #457 (tally A 299 / B 92; log entry D03). Starting the supervised run with maps/poodr-implementation.yaml.

Committee D03 ruled: the drive works #457 (tally A 299 / B 92; log entry D03). Starting the supervised run with maps/poodr-implementation.yaml.
Author
Owner

Resolution

Done: Ran ticket #457 end-to-end through maps/poodr-implementation.yaml to the merge-ready terminal: all eleven nodes dispatched, every handoff/gate/edge/bound-spend captured, both correction loops exercised with real defects (test-reviewer caught a syntax-broken test and routed the bounded fail edge to test-writer round 2; contract-auditor caught a mis-grouped relation column and routed to refactorer round 2). Two committee rulings mid-drive (D04 scope, D05 gate blocker). R3 evaluated: not triggered (largest gate output ~3.5KB, attribution succeeded both times). R4 evaluated: not evaluable — fallback agent types never matched the guard's role table; live proof stays with #454. Full record: docs/os-sdlc-rebuild/poodr-map-first-drive.md.

Evidence: Merged to main at 9749b87 (feature + drive record + D04/D05) and 4fc10e5 (D05 gate fix). Suite 1007 runs, 0 failures; #457 closed through the drive. Drive record commits the complete event log, observations O1-O7, and the R3/R4 evaluation.

Follow-ups: Captured with skeptic verdicts: #470 (nil-verdict wedge), #471 (remaining FK refs), #472 (handoff target prefix mismatch, O2), #473 (self-hosted schema wipe, O6). O7 (test-lint unroutable) merged into #453 as a design requirement per skeptic MERGE-INTO ruling. O1 is frozen #415 (already tracked). No others.

## Resolution **Done:** Ran ticket #457 end-to-end through maps/poodr-implementation.yaml to the merge-ready terminal: all eleven nodes dispatched, every handoff/gate/edge/bound-spend captured, both correction loops exercised with real defects (test-reviewer caught a syntax-broken test and routed the bounded fail edge to test-writer round 2; contract-auditor caught a mis-grouped relation column and routed to refactorer round 2). Two committee rulings mid-drive (D04 scope, D05 gate blocker). R3 evaluated: not triggered (largest gate output ~3.5KB, attribution succeeded both times). R4 evaluated: not evaluable — fallback agent types never matched the guard's role table; live proof stays with #454. Full record: docs/os-sdlc-rebuild/poodr-map-first-drive.md. **Evidence:** Merged to main at 9749b87 (feature + drive record + D04/D05) and 4fc10e5 (D05 gate fix). Suite 1007 runs, 0 failures; #457 closed through the drive. Drive record commits the complete event log, observations O1-O7, and the R3/R4 evaluation. **Follow-ups:** Captured with skeptic verdicts: #470 (nil-verdict wedge), #471 (remaining FK refs), #472 (handoff target prefix mismatch, O2), #473 (self-hosted schema wipe, O6). O7 (test-lint unroutable) merged into #453 as a design requirement per skeptic MERGE-INTO ruling. O1 is frozen #415 (already tracked). No others.
jared closed this issue 2026-08-21 19:14:23 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jared/cc-os#467
No description provided.