414 B
414 B
Old Rollout Plan
This is the original rollout plan for the v1 launch. It has been fully superseded by the current plan and is retained only for historical reference.
Phases
- Stand up the staging cluster.
- Cut traffic over during the maintenance window.
- Decommission the old fleet.
The content here is still accurate as a record but no longer drives any work — the live plan replaced it entirely.