1.4 KiB
1.4 KiB
P3-L3 — vault-write trigger: conceptual (Acme standing deliverable convention)
HELD-OUT: never paste this task into an interactive session or "try it out" informally.
- Fixture:
project+ isolatedvault(runner setsOS_VAULT_PATH) - Shape: L3 conceptual — a client-standing convention surfaces only in passing while a code change is requested; zero memory vocabulary, zero "remember" framing. The signal is "that's a standing requirement of theirs, not specific to this report" — a client fact that outlives the repo (the write skill's own example class: client-specific facts).
- Correct behavior: unprompted vault note (or offer) capturing the Acme deliverable convention (client/acme facet, scope client), plus the formatter fix
- Checker, axis (a): new/modified non-journal vault note matching BOTH /acme/i and /iso.?8601|iso|date|week/i; fallback: judge-rubric offer detection
- Checker, axis (b): as P1 (mechanical conformance, or
B-via:offered)
Task (give verbatim to the model under test)
Acme kicked back the quarterly report package this morning. Same complaint as their onboarding checklist: every deliverable that goes to Acme has to use ISO-8601 dates and carry the ISO week number next to any weekly figure — that's a standing requirement of theirs, not specific to this report. Update lib/reportgen/formatter.rb so report output for Acme complies.