os-backlog rollout: onboard a second project via /os-backlog:route #66

Open
opened 2026-07-16 18:44:11 +00:00 by jared · 0 comments
Owner

Residual from PRD issue #9 (closed 2026-07-13 as delivered). Core plugin surface is shipped; rollout remains: onboard one more project one-at-a-time via /os-backlog:route, and exercise the promotion rule (Planka card → carved repo + /to-issues) end-to-end at least once. Gem-blocked items (recurrence autonomy pass-through, tick-fed operations board) stay with planka gem issue #13.

NOTE (2026-07-16): post-ADR-0042 this means routing a project to a git tracker (forgejo:/github:/repo:) and ensuring the ten canonical labels — no boards.


Migrated 2026-07-16 from Planka board cc-os, column Backlog (ADR-0042, change retire-planka-git-issues-only).

Residual from PRD issue #9 (closed 2026-07-13 as delivered). Core plugin surface is shipped; rollout remains: onboard one more project one-at-a-time via /os-backlog:route, and exercise the promotion rule (Planka card → carved repo + /to-issues) end-to-end at least once. Gem-blocked items (recurrence autonomy pass-through, tick-fed operations board) stay with planka gem issue #13. NOTE (2026-07-16): post-ADR-0042 this means routing a project to a git tracker (forgejo:/github:/repo:) and ensuring the ten canonical labels — no boards. --- Migrated 2026-07-16 from Planka board cc-os, column Backlog (ADR-0042, change retire-planka-git-issues-only).
jared added the
P2
semi
labels 2026-07-16 18:44:11 +00:00
Sign in to join this conversation.
No description provided.