Assemble the os-backlog lifecycle design #247

Closed
opened 2026-08-03 14:43:17 +00:00 by jared · 1 comment
Owner

Map: #239

Blocked by #240
Blocked by #241
Blocked by #242
Blocked by #243
Blocked by #244
Blocked by #245
Blocked by #246
Blocked by #249

Question

Fold all closed decisions from this map into the deliverable design (doc/spec + any ADRs via /os-adr:create), ready for implementation ticketing. Assembly issue in the #58 pattern.

Map: #239 Blocked by #240 Blocked by #241 Blocked by #242 Blocked by #243 Blocked by #244 Blocked by #245 Blocked by #246 Blocked by #249 ## Question Fold all closed decisions from this map into the deliverable design (doc/spec + any ADRs via /os-adr:create), ready for implementation ticketing. Assembly issue in the #58 pattern.
jared self-assigned this 2026-08-04 11:04:04 +00:00
Author
Owner

Resolution

Done. All nine closed decisions folded into the deliverable design, ready for implementation ticketing.

Evidence:

  • Design doc: docs/os-backlog-lifecycle.md on branch design/os-backlog-lifecycle (commit 5aa13db) — tiers, templates, refine, decision children + blind sweep, check-out, close, validator, wayfinder integration, plus an enumerated implementation work-item list.
  • ADRs recorded via /os-adr:create: ADR-0092 (three structural tiers, computed), ADR-0093 (canonical templates in os-backlog references), ADR-0094 (weighted-decision blocks + recommender-blind Ruby sweep), ADR-0095 (deterministic template validator), ADR-0096 (wayfinder conventions adopted as-is). Same branch/commit.

Out of scope / follow-ups:

  • Implementation sequencing/ticketing of the nine work items in the doc's "Implementation work items" section is post-map execution work (per the map's planning-only rule); the sections list is the ticketing input. Related existing issue: #186.
  • Merging design/os-backlog-lifecycle awaits human review (map is HITL-owned; ADRs affect locked conventions).

This was the final child: the map's route is complete.

## Resolution **Done.** All nine closed decisions folded into the deliverable design, ready for implementation ticketing. **Evidence:** - Design doc: `docs/os-backlog-lifecycle.md` on branch `design/os-backlog-lifecycle` (commit 5aa13db) — tiers, templates, refine, decision children + blind sweep, check-out, close, validator, wayfinder integration, plus an enumerated implementation work-item list. - ADRs recorded via /os-adr:create: ADR-0092 (three structural tiers, computed), ADR-0093 (canonical templates in os-backlog references), ADR-0094 (weighted-decision blocks + recommender-blind Ruby sweep), ADR-0095 (deterministic template validator), ADR-0096 (wayfinder conventions adopted as-is). Same branch/commit. **Out of scope / follow-ups:** - Implementation sequencing/ticketing of the nine work items in the doc's "Implementation work items" section is post-map execution work (per the map's planning-only rule); the sections list is the ticketing input. Related existing issue: #186. - Merging `design/os-backlog-lifecycle` awaits human review (map is HITL-owned; ADRs affect locked conventions). This was the final child: the map's route is complete.
jared closed this issue 2026-08-04 11:07:00 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jared/cc-os#247
No description provided.