This was generated by AI during triage.
Labeled ready-for-agent with a time gate: do not run before ~2026-07-22 (needs two weeks of NEW post-v3 sessions to audit). The run itself is…
This was generated by AI during triage.
Blocker cleared: #6 (Phase 1 foundation) is closed, so authoring can start.
Agent Brief
Goal: Author the 6 listed migration candidates as…
This was generated by AI during triage.
Removed ready-for-agent: this is the PRD/tracking issue, not a grabbable slice. Status: slices 1–6 (#10–#15) shipped and closed; remaining are #16…
This was generated by AI during triage.
Agent Brief
Goal: Cache the resolved Planka board id in .cc-os/config so card operations skip the projects+boards listing round-trip.
**Verifie…
This was generated by AI during triage.
Blockers cleared: #13 closed and #14 closed 2026-07-12 (route skill shipped in 696aefc). This slice is now unblocked and next in the chain. Type Semi…
This was generated by AI during triage.
Shipped in commit 696aefc (2026-07-12): /os-backlog:route skill + inspect/config-write CLI subcommands with minitest coverage. cc-os itself is…
This was generated by AI during triage.
Shipped in commit cf14bb3 (2026-07-12): ADR-027 records the .cc-os/ convention, os-doc-hygiene state migrated with backward-compat fallback,…