Trial takedown on 10 code-change tickets, then run the implement-side eval #975
Labels
No labels
P0
P1
P2
P3
bug
category/code-change
category/cross-repo
category/eval-run
category/investigation
category/no-test-target
category/owner-ruling
category/prose-artifact
category/recurring-chore
category/structure
category/umbrella
crc-refactor
create
delete
enhancement
filed-by/agent
filed-by/user
frozen
lint-rule
needs-info
needs-triage
next
plugin/cc-architect
plugin/os
plugin/os-adr
plugin/os-aidd-lint
plugin/os-backlog
plugin/os-context
plugin/os-doc-hygiene
plugin/os-sdlc
plugin/os-vault
project/cc-os
ready-for-agent
ready-for-human
recurring
review
rule-proposal
update
waiting
wayfinder:grilling
wayfinder:map
wayfinder:map
wayfinder:research
wayfinder:task
wayfinder:task
wontfix
worklist/deviations
worklist/lint-rule
worklist/new-implement-build
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
jared/cc-os#975
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Problem
No evidence shows that the takedown design-first path completes a ticket green at a lower cost than
poodr-ticket-implementation. The owner ruled on 2026-10-09 (handoffdocs/handoffs/2026-10-09-takedown-implement-path.md) that a trial on 10code-changetickets comes first, then an implement-side eval.Reproduce
n/a: trial and eval ticket.
Approach
Handoff build-order steps 8 and 9. Trial: 10
code-changetickets across at least 3 targets, estimated 40 to 85 USD. Record per ticket: design cost and time, rounds, live grade, implement report (os-sdlc-implementation-report <id>: dispatches, elapsed_s, retries, tokens), terminal node. Implement-side eval only if at least 3 of 10 reach parity or better and complete green. Cases are frozen designs at their base commits. Metric: USD and wall time. Hard gate:implementation_complete, suite green, design tests unmodified. Levers: per-node model, place-tests and place-code cards, keep or drop behavior-verifier and contract-auditor. Read~/Documents/SecondBrain/howto/running-autoresearch-skill-evals.mdanddocs/eval-discipline.mdbefore the eval.Blocked by: #972 (takedown-implement map), #974 (live grading), #973 (ticket category).
Required work:
docs/handoffs/.Acceptance criteria
Owner sketch
Origin
docs/handoffs/2026-10-09-takedown-implement-path.md.docs/adr/0276-ticket-takedown-runs-one-pipeline-the-eval-harness-flow-is-the-production-pipeline-live-mode.md)plugins/os-sdlc/eval/ticket-takedown/,plugins/os-sdlc/maps/,plugins/os-sdlc/skills/implement/SKILL.mdVERDICT: CREATE