os-sdlc hook 1/3: live PostToolUse payload capture #399

Closed
opened 2026-08-15 10:44:48 +00:00 by jared · 1 comment
Owner

Child of #333. After #330+#332. Instrument hooks/post_tool_use.rb to log one real event, refresh cache, one real Agent call; confirm tool_name==Agent and tool_input.subagent_type present. Existing tests manufacture these fields — only a live event is evidence. Update dispatch-hook.md.

Child of #333. After #330+#332. Instrument hooks/post_tool_use.rb to log one real event, refresh cache, one real Agent call; confirm tool_name==Agent and tool_input.subagent_type present. Existing tests manufacture these fields — only a live event is evidence. Update dispatch-hook.md.
Author
Owner

Resolution

Done: Live-captured a real PostToolUse event: hook is armed and firing; tool_name Agent, tool_input.subagent_type, cwd confirmed; tool_use_id present (docs corrected); async dispatches fire the hook at launch not completion

Evidence: Capture from live session 2026-08-15; docs commit eacd3e5687; instrumentation reverted and cache refreshed

Follow-ups: Async-launch timing ticket #402; shakedown proceeds in #400

## Resolution **Done:** Live-captured a real PostToolUse event: hook is armed and firing; tool_name Agent, tool_input.subagent_type, cwd confirmed; tool_use_id present (docs corrected); async dispatches fire the hook at launch not completion **Evidence:** Capture from live session 2026-08-15; docs commit eacd3e5687e6750e3bb0a8e521d70777c65015df; instrumentation reverted and cache refreshed **Follow-ups:** Async-launch timing ticket #402; shakedown proceeds in #400
jared closed this issue 2026-08-15 11:20:50 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
jared/cc-os#399
No description provided.