os-backlog: record planka-api 0.2.0 migration in docs (implementation-status timeline + stale 0.1.0 mentions) #19
Labels
No Label
P0
P1
P2
P3
afk-ready
hitl
next
ready-for-agent
review
semi
waiting
wayfinder:grilling
wayfinder:map
wayfinder:research
wayfinder:task
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
No due date set.
Dependencies
No dependencies set.
Reference: jared/cc-os#19
Loading…
Reference in New Issue
No description provided.
Delete Branch "%!s(<nil>)"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
What to build
Commit
8df0cb7(planka-api 0.2.0 typed-returns migration) shipped without the required record-keeping. Per repo convention, add a timeline entry to docs/implementation-status.md describing the migration (typed Planka::Types accessors, BoardDetail replacing the included-hash, rebuilt test fakes) and update the os-backlog component section, which still says planka-api gem 0.1.0 is installed locally. Keep dates absolute (2026-07-10). Reference the snapshot-field regression fix (#18) once landed so the record describes the corrected state. No design change occurred, so CLAUDE.md's design paragraph stays untouched.Acceptance criteria
Blocked by