14 lines
414 B
Markdown
14 lines
414 B
Markdown
|
|
# Old Rollout Plan
|
||
|
|
|
||
|
|
This is the original rollout plan for the v1 launch. It has been fully
|
||
|
|
superseded by the current plan and is retained only for historical reference.
|
||
|
|
|
||
|
|
## Phases
|
||
|
|
|
||
|
|
1. Stand up the staging cluster.
|
||
|
|
2. Cut traffic over during the maintenance window.
|
||
|
|
3. Decommission the old fleet.
|
||
|
|
|
||
|
|
The content here is still accurate as a record but no longer drives any
|
||
|
|
work — the live plan replaced it entirely.
|