31 lines
2.5 KiB
Markdown
31 lines
2.5 KiB
Markdown
|
|
## 1. Record the decision
|
|||
|
|
|
|||
|
|
- [x] 1.1 Add ADR-013 to `docs/memory-system/03-architecture-decisions.md` recording the build-order inversion (vault-migration-first → build-first / migrate-incrementally), with rationale and rejected alternatives
|
|||
|
|
- [x] 1.2 Update the "Decisions locked" pointer in `CLAUDE.md` to reference ADR-013
|
|||
|
|
|
|||
|
|
## 2. Author the benchmark prompt deliverable
|
|||
|
|
|
|||
|
|
- [x] 2.1 Choose and create the home for the prompt and per-model reference outputs (default `docs/memory-system/benchmark/`)
|
|||
|
|
- [x] 2.2 Write the shared minimal extraction spec (entities, typed relationships, `INFERRED`/`AMBIGUOUS` confidence) as the schema the subagents must emit
|
|||
|
|
- [x] 2.3 Write the copy/paste-able dispatch prompt file: one subagent per Claude tier (`claude-haiku-4-5`, `claude-sonnet-4-6`, `claude-opus-4-8`), fairness contract (note text + spec only; no repo/project context), per-model output files
|
|||
|
|
- [x] 2.4 Confirm the prompt embeds the output schema verbatim and names the fixture inputs and per-model output paths
|
|||
|
|
|
|||
|
|
## 3. Rewrite Step 2c (benchmark) in the runbook
|
|||
|
|
|
|||
|
|
- [x] 3.1 Replace Step 2c's model table/metrics with the reference-set design: Claude tiers only, quality-only metrics, speed deferred to the later Ollama run
|
|||
|
|
- [x] 3.2 State that the per-model reference set is the rubric local Ollama models are scored against later, and point to the prompt file
|
|||
|
|
- [x] 3.3 Update Open question §6 to reflect that the Claude reference run produces references (not the final model choice)
|
|||
|
|
|
|||
|
|
## 4. Resequence Step 1 (migration) in the runbook
|
|||
|
|
|
|||
|
|
- [x] 4.1 Rewrite Step 1 so bulk vault migration is deferred; keep only fixture-note selection (5–10 notes, deliberate variety) as the pre-build step
|
|||
|
|
- [x] 4.2 Add the post-build sequence: validate end-to-end on one small mixed code+docs project, then onboard projects one at a time with observe-and-adjust between each
|
|||
|
|
- [x] 4.3 Make the four distinct items explicit in the runbook: benchmark fixtures / deferred bulk migration / initial mixed validation project / project-by-project rollout
|
|||
|
|
- [x] 4.4 Note the migration-unit granularity question and that vault notes (SLM path) and project code (tree-sitter path) are different extraction paths
|
|||
|
|
|
|||
|
|
## 5. Reconcile and verify
|
|||
|
|
|
|||
|
|
- [x] 5.1 Check `docs/memory-system/04-build-plan.md` for any statement of the old "migration first" order and reconcile it with ADR-013
|
|||
|
|
- [x] 5.2 Update the `_Last updated:_` / status lines on every edited design doc
|
|||
|
|
- [x] 5.3 Re-read the edited runbook end-to-end to confirm Step 1 and Step 2c are internally consistent and the four distinct items are not blurred
|