cc-os/docs/adr/0013-build-first-migrate-in...

57 lines
3.4 KiB
Markdown
Raw Permalink Normal View History

---
id: "0013"
date: 2026-06-04
status: Accepted
supersedes:
superseded-by:
affected-paths: []
affected-components: []
migration_confidence: medium
migration_source: "docs/memory-system/03-architecture-decisions.md### ADR-013 — Build-first / migrate-incrementally (build-order inversion)"
---
# 0013 — Build-first / migrate-incrementally (build-order inversion)
## Context
The build runbook (`05-implementation-process.md`) originally front-loaded bulk
vault migration as Step 1 — migrating all ~20 existing SecondBrain notes and all projects to
the ADR-011 six-facet taxonomy before the system existed to validate them. This committed to
a schema and workflow (the tag taxonomy from ADR-011, the vault-reuse choice from ADR-012,
and Graphify extraction behavior) before any end-to-end path had been exercised. The risk:
locking in an approach that fails at scale, with no feedback loop until the entire vault has
been touched.
## Decision
**Invert the build order.** The full system is built and validated against a
small **510 note fixture set** first. Bulk vault migration is deferred to the final stage.
The first real-data validation uses **one small project that contains both code AND
documents**, exercising both the local-SLM doc-extraction path and the tree-sitter code path
in the same run. After that single project validates end-to-end, remaining projects are
onboarded **one at a time** with an observe-and-adjust step between each.
- **Rationale**: Validates the ADR-011 taxonomy and ADR-012 vault conventions against the real
Graphify extraction pipeline before the entire vault is committed. The first mixed code+docs
project surfaces both extraction paths (SLM for docs, tree-sitter for code) early, when
corrections are cheap. Per-project rollout keeps the blast radius of any schema or workflow
correction small; each project is an opportunity to observe and adjust rather than discover
problems across 20 notes at once. This is consistent with the "markdown-as-truth, indexes are
disposable" principle (ADR-008): the vault notes are durable, but the extraction schema should
be validated before it shapes all of them.
## Consequences
The build order was inverted so the full system is validated against a small 5-10 note fixture set first, with bulk vault migration deferred to the final stage; the first real-data validation uses one project mixing code and docs, then remaining projects are onboarded one at a time with an observe-and-adjust step between each. This reduces the blast radius of any taxonomy or workflow correction compared to migrating the whole vault before validating the pipeline.
## Alternatives rejected
- **Keep migration-first (status quo)**: Front-loads all ~20 notes and all projects before
any end-to-end validation exists. Commits to ADR-011's taxonomy and ADR-012's migration
steps against the full vault without a feedback loop — exactly the gap this decision closes.
- **Big-bang migrate everything after build**: Build against fixtures, then migrate all notes
and all projects in one batch at the end. Avoids the pre-build commitment problem but still
risks a single large irreversible migration with no observe-and-adjust loop between units.
Per-project rollout with intermediate checkpoints is strictly safer.
- **Cross-references**: ADR-011 (six-facet tag taxonomy — the schema being validated);
ADR-012 (SecondBrain vault reuse — the migration steps this order defers).